Board guide
How to choose a structural engineer and building inspector
A checklist for boards and managers hiring structural engineers and milestone inspectors: what to verify, what to ask and the warning signs, so the board can compare proposals on the same terms.
Since the 2021 Surfside collapse, structural inspections have moved from good practice to legal duty in several states. Florida (milestone inspections), California (balconies and other elevated elements) and New Jersey (periodic structural inspections) have each enacted inspection statutes, and the state pages link to the text. Boards elsewhere commission the same work when a building ages, leaks or changes insurers.
Before you ask for proposals
Write down the scope first: what the job includes, the size of the property, the deadline and any statute or insurance requirement that drives it. Proposals built on the same scope can be compared line by line; proposals built on each vendor’s own idea of the job cannot. Decide who on the board or management team will collect questions, and set a date for proposals to arrive.
What to check
- Confirm the engineer's professional engineer licence in your state, and that the person signing the report holds it.
- Ask for professional liability (errors and omissions) insurance and its limits.
- Ask for sample reports from similar buildings, with names removed.
- Make sure the engineer has no financial tie to the repair contractor.
- Agree in writing what happens if the inspection finds substantial structural deterioration, including timelines for the next phase.
- Check whether the proposal includes destructive testing or only a visual inspection.
Questions to ask every candidate
- Who will sign and seal the report, and are they licensed in this state?
- How many inspections of buildings like ours have you done in the last two years?
- Is destructive testing included, or priced separately?
- How long from site visit to final report?
- Do you have any relationship with contractors you might recommend?
- What is your hourly rate for follow-up questions and board meetings?
Warning signs
- An engineer who is also bidding to do the repairs.
- A price far below others that leaves out testing the statute or your building needs.
- Reports signed by someone not licensed in the state.
- No clear statement of what was and was not inspected.
Making the decision
Put the proposals side by side in a simple table: price, what is included, licence and insurance checked, references called, warranty and contract terms. Vote on the record at a properly noticed board meeting, and record the reasons in the minutes. Owners can ask to see how the board chose, and a clear record protects the volunteers who made the call.
After the vote, put everything in a written contract the association’s attorney has reviewed when the value or risk warrants it, and keep the certificate of insurance and licence check in the official records.
By state
Licensing rules differ by state. Each state page lists the regulator and the statute we hold.
- Alabama
- Alaska
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- District of Columbia
- Florida
- Georgia
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Questions boards ask
- Can an architect do a milestone inspection?
- Read the statute that applies to your building. In Florida that is s. 553.899; the state pages link to the text for each state where we hold it.
- Is a reserve study the same as a structural inspection?
- No. A reserve study plans funding for component replacement. A structural inspection assesses whether the structure is safe. Florida's SIRS sits between the two and has its own rules.
- Should the engineer also oversee the repairs?
- Often yes. The engineer who wrote the specifications is best placed to check that the contractor follows them.
Written and reviewed by the Common Elements editorial team, 2026-11-28. Licensing reference reviewed 2026-11-28. Counts from public records as of 2026-11-28. Reference information, not legal advice. Confirm licences with the issuing board. Report a correction.